St. Petersburg Times
Special report
Video report
  • For their own good
    Fifty years ago, they were screwed-up kids sent to the Florida School for Boys to be straightened out. But now they are screwed-up men, scarred by the whippings they endured. Read the story and see a video and portrait gallery.
  • More video reports
Multimedia report
Print Email this storyEmail story Comment Email editor
Fill out this form to email this article to a friend
Your name Your email
Friend's name Friend's email
Your message
 

The Latest Development

The Enclave at Palma Ceia

By MICHAEL CANNING
Published July 1, 2005


LOCATION: 3105 W Watrous Ave., at MacDill Avenue

DEVELOPER: Thomas Everett Lamb

DESCRIPTION: The developer will divide an existing lot with a 1946 mansion into seven lots. Single-family houses will be built on six of the lots. The 6,800-square-foot mansion will be reduced to its original 5,500 square feet, moved to the seventh lot and refurbished. The new houses will have two stories, four bedrooms and 31/2 bathrooms. Each will range from 3,600 to 4,200 square feet. Their architecture will contain elements of the mansion's Tudor revival style. The shrunken mansion will have four bedrooms and 31/2 bathrooms.

PRICE: $1.2-million to $1.8-million for new houses; $1.5-million for the refurbished house.

DESIGNER: Thomas Everett Lamb

AMENITIES: The new homes will have hardwood floors with stone floors in bathrooms; custom cabinetry; casement windows; stainless steel kitchen appliances; 10- to 23-foot ceilings; rear patios; crown molding; prewiring for high speed Internet access, and audio and video entertainment systems; phone system with audio intercom; security system; and a two-car garage. Optional packages will include pools with spas and outdoor kitchens.

The existing house will be refurbished to its historic standards, with preserved ceiling heights, wood floors, molding and trim. Modern upgrades will include granite counters and stainless steel appliances in the kitchen, marble counters and limestone floors in the bathrooms.

WHAT THEY'RE SAYING: Lamb is using the property's many trees as a selling point for the project. "We are preserving probably 75 percent of the trees," he said.

"People also seem to be very pleased that we are preserving the (existing) house."

TIMELINE: Demolition work on the mansion and construction of the new homes should begin within three months, Lamb said. Construction should last about 16 months.

MOVE-IN DATE: November 2006.

FOR INFORMATION: Call listing agent Toni Everett at 839-5000.

- MICHAEL CANNING, Times correspondent

The Latest Development features a new residential or commercial project. To suggest a project, e-mail mikecanning@hotmail.com or call 226-3394.

[Last modified June 30, 2005, 09:10:08]


Share your thoughts on this story

Comments on this article
Subscribe to the Times
Click here for daily delivery
of the St. Petersburg Times.

Email Newsletters

ADVERTISEMENT